• Home
  • AboutUs
  • News
  • Products
  • Projects
  • Service
  • Cooperation
  • ContactUs
SMT Pick and Place Machine
  • Home
  • AboutUs
    • CompanyPresidential SpeechHistoryCorporate CultureOrganization
  • News
    • TechnologyNews
  • Products
    • SMT LineSMT Assembly LineSMT Production LinePCB Assembly LineSMT Solutions
  • Projects
    • LED LightsLED TVSMT OEMSecurity IndustrySmart Phone5G Products
  • Service
    • After ServiceService ModeService Content
  • Cooperation
    • PartnersAgent
  • ContactUs

News

Technology
News

Change the Way You Think About Changeover – Part 1

From:    Author:Mark Hardy    Publish time:2021-09-13 13:46    Clicks:0
If you are looking to boost your output or increase your responsiveness to customer demand, then you need to take a look at reducing your changeovers or setups. If you typically spend one hour to change over a machine or line and you run 8 to 10 setups a week, you’re wasting a whole day a week, or up to 52 days a year, of potential production time! This changeover time can come at a significant cost to your company’s revenue potential!  Read on for more as we invite you to “Change the Way You Think About Changeover.”
In manufacturing, changeover is the process of converting a line or machine from running one product to another.  Or in other words, the time it takes to go from the last good part of one product run to the first good part of the next product run. Quick changeover is critical to lean manufacturing, because it provides the flexibility to match the product mix to actual demand. In turn, this prevents the accumulation of inventory that can add cost and substantial waste to a value stream.
 
Changeover can take a few minutes to as much as several hours, and be required several times a day (production dependent). Changeover can be divided into three categories, teardown, set-up and first article build.
 
Teardown includes the removal of the previous product, materials and components from the line. It can range from minor to major, requiring complete teardown of the equipment.
Set-up is the process of actually converting the equipment. This may be achieved by adjusting the equipment to correspond to the next product or by changing non-adjustable “change parts” to accommodate the product. Typically it will be a combination of both.
First article build is the time spent reviewing the process after it has been restarted. It is characterized by validating that 100% First Pass Yield will be achieved when production resumes.
Changeover is one of the largest contributors to SMT line ineffectiveness and lost revenue.  The first step in determining the cost of changeover is to establish your yearly revenue generation goals per line and then extrapolate that over time.
 
Yearly Revenue Generation Goals per SMT line:
 
Time in Minutes & Dollars:
 
Time Table_Changeover Blog
 
These tables assign tangible dollar values to units of production time and highlight two very important considerations:
 
Time Lost is not recoverable
Time Saved enables greater revenue generation
So how do you reduce your changeover costs and increase your revenue generation?
 
First, let’s start with this question: How should you measure the changeover time of your line; specifically where does it start and end?
 
For a single machine, changeover time starts when the machine completes the last PCB of the previous run, and stops when the first PCB of the next job enters the machine.
For a line, changeover time starts when the last machine in the line completes the last PCB of the previous run, and stops when the first PCB of the next job enters the first machine in the line. Total changeover is more than just downtime of the machines. It should also include the time needed to verify the first assembly, also called first article build.
 
I.C.T is a manufacturer of SMT machines. It mainly provides customers with SMT production lines including SMT Stencil Printers,  Pick and place machines, Reflow Oven, AOI Machine, Wave Soldering Machine and PCB Handling Machine etc. I.C.T has more than 25 researches on SMT and DIP technology,  for the world Customers provide SMT total solutions. There are successful cases of SMT technICal team in Asia, Europe, AmerICa, AfrICa, and Australia.
More details, please contact us:
Tel: +86 13670124230 (WhatsApp/Skype/WeChat)
Email: etaSMT@foxmail.com
 
There are many different methods of calculating your changeover time. However, changeover is just one element of an efficient manufacturing model. A more telling metric is that of Overall Equipment Effectiveness (OEE), which takes into consideration a more comprehensive set of factors: downtime (availability), performance and quality rate.
 
Full Automatic Assembly LED Bulbe Line, Assembly Line For LED Steet Light, Stencils Printer Gucci, Stencil Template Printer Ink, Converyer Reflow Oven, Small SMT Reflow Oven, Wave Solder Machine, SMT Machine Nozzle Motor, SMT Glue Centrifuge Machine, Fabrication SMT Machine Frame, Mydata SMT Machine Spars, Samsung Sm310 SMT Machine, Chip Mounting Machine SMT, Automatic Inspection PCB Conveyor, Conveyor For Electronic PCB Transmission, Surface Mount PCB Shuttle Conveyor, Automatic Inspection PCB Conveyor For Electronic, Stainless Steel Chain PCB Conveyor In Electronics, Conveyor SMT
[Comments:0/Comment] [Bookmark] [Big Medium Small] [Print] [Close]
MoreNews Comment
Quick Comment
TITLE:
NAME
CONTENT
(*)

Related Comment
AboutUs
Company
Presidential Speech
History
Corporate Culture
Organization
News
Technology
News
Products
SMT Line
SMT Assembly Line
SMT Production Line
PCB Assembly Line
SMT Solutions
Projects
LED Lights
LED TV
SMT OEM
Security Industry
Smart Phone
5G Products
Service
After Service
Service Mode
Service Content
Copyright 2011 © SMT,Pick and Place Machine,SMT Assembly Line,SMT Machine,SMT Stencil Printer,SMT Reflow Oven,SMT Total Solution |CMSADMIN

Wave Soldering MachineFPC Feinforcement MachinePick and Place MachineSMT MachineYAMAHA Pick and Place MachineHanwha SMT MachineJUKI Pick and Place MachinePanasonic SMT MachineSMT Reflow OvenSMT Solution